Determining the probability distribution of rework costs in construction and engineering projects
Auteur(s): |
Peter E. D. Love
Chun-Pong Sing |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structure and Infrastructure Engineering, novembre 2013, n. 11, v. 9 |
Page(s): | 1136-1148 |
DOI: | 10.1080/15732479.2012.667420 |
- Informations
sur cette fiche - Reference-ID
10143432 - Publié(e) le:
06.12.2018 - Modifié(e) le:
06.12.2018