0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design Example for Bridge Pier Scour Measures Using Toskanes

Author(s):



Medium: journal article
Language(s): English
Published in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1523
Page(s): 173-177
DOI: 10.1177/0361198196152300121
Abstract:

Toskanes were developed as an alternative scour countermeasure where riprap is not feasible or available in large sizes. The Toskane design procedure is based on results of a hydraulic model study of several different piers and abutments. Toskanes can be fabricated in sizes to meet the design requirements. One example of installing Toskanes at a bridge with a pier and vertical abutments is presented. Criteria are provided to size the Toskane. Techniques for installation are suggested and costs for the project are estimated.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1177/0361198196152300121.
  • About this
    data sheet
  • Reference-ID
    10778585
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine