0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design Example for Bridge Pier Scour Measures Using Toskanes

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 1523
Seite(n): 173-177
DOI: 10.1177/0361198196152300121
Abstrakt:

Toskanes were developed as an alternative scour countermeasure where riprap is not feasible or available in large sizes. The Toskane design procedure is based on results of a hydraulic model study of several different piers and abutments. Toskanes can be fabricated in sizes to meet the design requirements. One example of installing Toskanes at a bridge with a pier and vertical abutments is presented. Criteria are provided to size the Toskane. Techniques for installation are suggested and costs for the project are estimated.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1177/0361198196152300121.
  • Über diese
    Datenseite
  • Reference-ID
    10778585
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine