0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design, construction and monitoring of continuous curved box girder bridge during bearing replacement-case study

Author(s): ORCID (School of Civil Engineering, Heilongjiang University, Harbin, P.R. China)
ORCID (School of Civil Engineering, Heilongjiang University, Harbin, P.R. China)
ORCID (School of Civil Engineering, Heilongjiang University, Harbin, P.R. China)
ORCID (School of Civil Engineering, Heilongjiang University, Harbin, P.R. China)
ORCID (School of Civil Engineering, Heilongjiang University, Harbin, P.R. China)
Medium: journal article
Language(s): English
Published in: Structure and Infrastructure Engineering
Page(s): 1-25
DOI: 10.1080/15732479.2023.2266725
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/15732479.2023.2266725.
  • About this
    data sheet
  • Reference-ID
    10742947
  • Published on:
    28/10/2023
  • Last updated on:
    14/01/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine