Design, construction and monitoring of continuous curved box girder bridge during bearing replacement-case study
Auteur(s): |
Hongshuai Gao
Jiashuo Jian Bochen Li Yue Sun Hongbo Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structure and Infrastructure Engineering |
Page(s): | 1-25 |
DOI: | 10.1080/15732479.2023.2266725 |
- Informations
sur cette fiche - Reference-ID
10742947 - Publié(e) le:
28.10.2023 - Modifié(e) le:
14.01.2024