Design and construction of a snowfall protection structure on the Baku-Tbilisi-Kars rail corridor, Georgia
Author(s): |
Mikus Cirulis
Maris Cirulis |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | The Structural Engineer, August 2019, n. 8, v. 97 |
Page(s): | 16-23 |
DOI: | 10.56330/bcxn8307 |
Abstract: |
This project involved the design and construction of a structure comprising four tunnels with a total length of 2434m. An initial in situ concrete scheme was changed to a corrugated steel plate assembly, enabling improvements in material transportation and construction. |