Design and construction of a snowfall protection structure on the Baku-Tbilisi-Kars rail corridor, Georgia
Autor(en): |
Mikus Cirulis
Maris Cirulis |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | The Structural Engineer, August 2019, n. 8, v. 97 |
Seite(n): | 16-23 |
DOI: | 10.56330/bcxn8307 |
Abstrakt: |
This project involved the design and construction of a structure comprising four tunnels with a total length of 2434m. An initial in situ concrete scheme was changed to a corrugated steel plate assembly, enabling improvements in material transportation and construction. |
- Über diese
Datenseite - Reference-ID
10762873 - Veröffentlicht am:
23.03.2024 - Geändert am:
23.03.2024