Delays in Building Construction Projects in Ghana
Author(s): |
Frank DK Fugar
Adwoa B. Agyakwah-Baah |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Australasian Journal of Construction Economics and Building, July 2010, n. 1-2, v. 10 |
Page(s): | 103-116 |
DOI: | 10.5130/ajceb.v10i1-2.1592 |
Abstract: |
This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
Geographic Locations
0.33 MB
- About this
data sheet - Reference-ID
10338870 - Published on:
05/08/2019 - Last updated on:
02/06/2021