Delays in Building Construction Projects in Ghana
Auteur(s): |
Frank DK Fugar
Adwoa B. Agyakwah-Baah |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Australasian Journal of Construction Economics and Building, juillet 2010, n. 1-2, v. 10 |
Page(s): | 103-116 |
DOI: | 10.5130/ajceb.v10i1-2.1592 |
Abstrait: |
This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original. |
Lieux géographiques
0.33 MB
- Informations
sur cette fiche - Reference-ID
10338870 - Publié(e) le:
05.08.2019 - Modifié(e) le:
02.06.2021