Defect investigation and replacement implementation of bearings for long-span continuous box girder bridges under operating high-speed railway networks: a case study
Author(s): |
Fengbo Ma
Huile Li Shitong Hou Xuecheng Kang Gang Wu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Structure and Infrastructure Engineering, January 2022, n. 5, v. 18 |
Page(s): | 1-16 |
DOI: | 10.1080/15732479.2020.1867589 |
- About this
data sheet - Reference-ID
10541069 - Published on:
09/01/2021 - Last updated on:
27/05/2022