Defect investigation and replacement implementation of bearings for long-span continuous box girder bridges under operating high-speed railway networks: a case study
Auteur(s): |
Fengbo Ma
Huile Li Shitong Hou Xuecheng Kang Gang Wu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structure and Infrastructure Engineering, janvier 2022, n. 5, v. 18 |
Page(s): | 1-16 |
DOI: | 10.1080/15732479.2020.1867589 |
- Informations
sur cette fiche - Reference-ID
10541069 - Publié(e) le:
09.01.2021 - Modifié(e) le:
27.05.2022