Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects
Author(s): |
Mehmet Emre Bayraktar
Makarand Hastak Sanjiv Gokhale Bhavin Safi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, September 2011, n. 9, v. 137 |
Page(s): | 645-655 |
DOI: | 10.1061/(asce)co.1943-7862.0000345 |
- About this
data sheet - Reference-ID
10235842 - Published on:
11/12/2018 - Last updated on:
11/12/2018