Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects
Auteur(s): |
Mehmet Emre Bayraktar
Makarand Hastak Sanjiv Gokhale Bhavin Safi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, septembre 2011, n. 9, v. 137 |
Page(s): | 645-655 |
DOI: | 10.1061/(asce)co.1943-7862.0000345 |
- Informations
sur cette fiche - Reference-ID
10235842 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018