Dams are a form of effort to conserve or protect water resources. The function of the Dam as a reservoir for water, irrigation, power generation, and flood control. However, in addition to its huge benefits, dam construction also can endanger the community’s safety, namely in the form of dam breaks. The main causes of dam break are overtopping and piping. So that analysis is needed related to dam break to minimize the impact. Based on the Zhong Xing HY21 software, the most severe impact of the break of the Gembong Dam was due to overtopping using the QInflow PMF design flood of 724.142 m³/s. It resulted in an inundation area of 54.682 km² with a maximum inundation height of 5.129 m. As a result of the break of the Gembong Dam, 37 villages downstream of the Gembong Dam were flooded. There are 80.819 people affected by this risk. It is stated that all affected villages are at the 4th hazard classification level or very high hazard.

License:

This creative work has been published under the Creative Commons Attribution 3.0 Unported (CC-BY 3.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10780757
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine