Dam Break Analysis of Gembong Dam Using Zhong Xing HY21
Auteur(s): |
K. E. Milleanisa
P. T. Juwono R. Asmaranto M. Ayu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | IOP Conference Series: Earth and Environmental Science, 1 décembre 2021, n. 1, v. 930 |
Page(s): | 012091 |
DOI: | 10.1088/1755-1315/930/1/012091 |
Abstrait: |
Dams are a form of effort to conserve or protect water resources. The function of the Dam as a reservoir for water, irrigation, power generation, and flood control. However, in addition to its huge benefits, dam construction also can endanger the community’s safety, namely in the form of dam breaks. The main causes of dam break are overtopping and piping. So that analysis is needed related to dam break to minimize the impact. Based on the Zhong Xing HY21 software, the most severe impact of the break of the Gembong Dam was due to overtopping using the QInflow PMF design flood of 724.142 m³/s. It resulted in an inundation area of 54.682 km² with a maximum inundation height of 5.129 m. As a result of the break of the Gembong Dam, 37 villages downstream of the Gembong Dam were flooded. There are 80.819 people affected by this risk. It is stated that all affected villages are at the 4th hazard classification level or very high hazard. |
License: | Cette oeuvre a été publiée sous la license Creative Commons Attribution 3.0 (CC-BY 3.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée. |
1.11 MB
- Informations
sur cette fiche - Reference-ID
10780757 - Publié(e) le:
12.05.2024 - Modifié(e) le:
12.05.2024