Current state of design, investigation and construction works at the Koralm Tunnel / Zum Stand der Planungs-, Erkundungs- und Ausführungsarbeiten beim Koralmtunnel
Author(s): |
G. Harer
J. Koinig |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2010, n. 2, v. 3 |
Page(s): | 155-162 |
DOI: | 10.1002/geot.201000019 |
Abstract: |
The Koralmbahn railway line between Graz and Klagenfurt is an essential link in the Baltic-Adriatic Corridor. The new high-speed line will create new capacities and significantly better conditions for environmentally friendly goods transport by rail. The current journey times for passengers will be reduced considerably. The Koralm Tunnel with a length of 32.9 km is the most important section of the new Koralmbahn. The article reports on the current state of design, investigation and construction at the Koralm Tunnel and examples of further development are presented. |
Keywords: |
project status optimisation of the tunnel cross-section drainage system crack-limited invert slab
|