Crossing motorways under traffic without intermediate piers
Author(s): |
Jacques Berthellemy
David Schavits Charlotte Erre |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Steel Construction, August 2016, n. 3, v. 9 |
Page(s): | 200-206 |
DOI: | 10.1002/stco.201610028 |
Abstract: |
The European research programme SBRI attempted to reveal the costs caused during the service life of a bridge - direct costs for the bridge owner as well as indirect costs for users. The principal results of SBRI should make it possible to take better account of the true costs of a central pier by considering the risks in the construction phase and those that may threaten the highway overpass during its service life. |
Keywords: |
tied-arch bridge safety integral bridge steel-concrete composite bridge overpass motorway crossings CL cut for dowel connection
|
Available from: | Refer to publisher |
Structures and Projects
- About this
data sheet - Reference-ID
10073699 - Published on:
02/10/2016 - Last updated on:
02/10/2016