Crossing motorways under traffic without intermediate piers
Auteur(s): |
Jacques Berthellemy
David Schavits Charlotte Erre |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Steel Construction, août 2016, n. 3, v. 9 |
Page(s): | 200-206 |
DOI: | 10.1002/stco.201610028 |
Abstrait: |
The European research programme SBRI attempted to reveal the costs caused during the service life of a bridge - direct costs for the bridge owner as well as indirect costs for users. The principal results of SBRI should make it possible to take better account of the true costs of a central pier by considering the risks in the construction phase and those that may threaten the highway overpass during its service life. |
Mots-clé: |
pont bow-string pont intégral pont mixte acier-béton
|
Disponible chez: | Voir chez l'éditeur |
Ouvrages et projets
- Informations
sur cette fiche - Reference-ID
10073699 - Publié(e) le:
02.10.2016 - Modifié(e) le:
02.10.2016