0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Creating a working space for modifying and maintaining the cutterhead of a large-diameter slurry shield: A case study of Beijing railway tunnel construction

This publication has been cited in the following 13 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10089404
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine