Creating a working space for modifying and maintaining the cutterhead of a large-diameter slurry shield: A case study of Beijing railway tunnel construction
Author(s): |
Xinggao Li
Dajun Yuan |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, February 2018, v. 72 |
Page(s): | 73-83 |
DOI: | 10.1016/j.tust.2017.11.008 |
- About this
data sheet - Reference-ID
10089404 - Published on:
07/12/2018 - Last updated on:
07/12/2018