Creating a Construction Schedule Specyfing Fuzzy Norms and the Number of Workers

Author(s):

Medium: journal article
Language(s): English
Published in: Archives of Civil Engineering, , n. 3, v. 62
Page(s): 149-166
DOI: 10.1515/ace-2015-0089
Abstract:

The basic element of a project organizing construction works is a schedule. The preparation of the data necessary to specify the timings of the construction completion as indicated in the schedule involves information that is uncertain and hard to quantify. The article presents the methods of building a schedule which includes a fuzzy amount of labour, time standards and number of workers. The proposed procedure allows determining the real deadline for project completion, taking into account variable factors affecting the duration of the individual works.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ace-2015-0089.
  • About this
    data sheet
  • Reference-ID
    10476829
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine