Creating a Construction Schedule Specyfing Fuzzy Norms and the Number of Workers

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Archives of Civil Engineering, , n. 3, v. 62
Page(s): 149-166
DOI: 10.1515/ace-2015-0089
Abstrait:

The basic element of a project organizing construction works is a schedule. The preparation of the data necessary to specify the timings of the construction completion as indicated in the schedule involves information that is uncertain and hard to quantify. The article presents the methods of building a schedule which includes a fuzzy amount of labour, time standards and number of workers. The proposed procedure allows determining the real deadline for project completion, taking into account variable factors affecting the duration of the individual works.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1515/ace-2015-0089.
  • Informations
    sur cette fiche
  • Reference-ID
    10476829
  • Publié(e) le:
    25.11.2020
  • Modifié(e) le:
    25.11.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine