Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting
Author(s): |
Moncer Hariga
Sameh M. El-Sayegh |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2011, n. 1, v. 137 |
Page(s): | 56-64 |
DOI: | 10.1061/(asce)co.1943-7862.0000251 |