Moncer Hariga
- The multi resource leveling and materials procurement problem: an integrated approach. In: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020). (2020):
- Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting. In: Journal of Construction Engineering and Management, v. 137, n. 1 (January 2011). (2011):
- Hybrid meta-heuristic methods for the multi-resource leveling problem with activity splitting. In: Automation in Construction, v. 27 (November 2012). (2012):