0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The contributions of the Last Planner System to resilient performance in construction projects

Author(s): (Department of Civil Engineering, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil)
(Industrial Engineering and Transportation Department, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil)
(Department of Civil Engineering, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil)
(Department of Civil Engineering, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil)
Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 4, v. 42
Page(s): 1-18
DOI: 10.1080/01446193.2023.2262622
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2023.2262622.
  • About this
    data sheet
  • Reference-ID
    10743409
  • Published on:
    28/10/2023
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine