The contributions of the Last Planner System to resilient performance in construction projects
Auteur(s): |
Douglas Comassetto Hamerski
(Department of Civil Engineering, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil)
Tarcisio Abreu Saurin (Industrial Engineering and Transportation Department, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil) Carlos Torres Formoso (Department of Civil Engineering, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil) Eduardo Luis Isatto (Department of Civil Engineering, Federal University of Rio Grande do Sul (UFRGS), Porto Alegre, Brazil) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, octobre 2023, n. 4, v. 42 |
Page(s): | 1-18 |
DOI: | 10.1080/01446193.2023.2262622 |
- Informations
sur cette fiche - Reference-ID
10743409 - Publié(e) le:
28.10.2023 - Modifié(e) le:
15.03.2024