0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Contractual Approach for Facilitating the Resolution of Dispute over a Contractor’s Failure to Comply with Time Limit for Notice of Delays

Author(s): (Senior Lecturer in Quantity Surveying and Construction Economics, Melbourne School of Design, Faculty of Architecture Building and Planning, Univ. of Melbourne Parkville, Victoria 3010, Australia.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 1
Page(s): 137-146
DOI: 10.1061/(asce)1943-4162(2009)1:3(137)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)1943-4162(2009)1:3(137).
  • About this
    data sheet
  • Reference-ID
    10579614
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine