Contractual Approach for Facilitating the Resolution of Dispute over a Contractor’s Failure to Comply with Time Limit for Notice of Delays
Auteur(s): |
Ajibade Ayodeji Aibinu
(Senior Lecturer in Quantity Surveying and Construction Economics, Melbourne School of Design, Faculty of Architecture Building and Planning, Univ. of Melbourne Parkville, Victoria 3010, Australia.)
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2009, n. 3, v. 1 |
Page(s): | 137-146 |
DOI: | 10.1061/(asce)1943-4162(2009)1:3(137) |
- Informations
sur cette fiche - Reference-ID
10579614 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021