0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Contract Administration Guidelines for Effectively and Efficiently Applying Different Delay Analysis Techniques under World Bank–Funded Projects

This publication lists 17 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10579723
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine