0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Contract Administration Guidelines for Effectively and Efficiently Applying Different Delay Analysis Techniques under World Bank–Funded Projects

Author(s): (Contracts Manager, Egyptian Resort Company, 44 Aziz Abaza St., Zamalek, Cairo, Egypt.)
(Assistant Professor, Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., 235C Walker Hall, P.O Box 9546, Mississippi State, MS 39762 (corresponding author).)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 1, v. 5
Page(s): 35-44
DOI: 10.1061/(asce)la.1943-4170.0000104
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000104.
  • About this
    data sheet
  • Reference-ID
    10579723
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine