Construction Scheduling and Stability of the Resulting Schedules

Author(s):
Medium: journal article
Language(s): English
Published in: Archives of Civil Engineering, , n. 2, v. 62
Page(s): 89-100
DOI: 10.1515/ace-2015-0067
Abstract:

The paper present the concept of stability assessing the of solutions which are construction schedules. Rank have been obtained through the use of task scheduling rules and the application of the KASS software. The aim of the work is the choice of the equivalent solution in terms of the total time of the project. The selected solution optimization task should be characterized by the highest resistance to harmful environmental risk factors. To asses the stability of schedule simulation technique was used.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1515/ace-2015-0067.
  • About this
    data sheet
  • Reference-ID
    10476840
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine