Construction Scheduling and Stability of the Resulting Schedules
Auteur(s): |
M. Krzemiński
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Archives of Civil Engineering, juin 2016, n. 2, v. 62 |
Page(s): | 89-100 |
DOI: | 10.1515/ace-2015-0067 |
Abstrait: |
The paper present the concept of stability assessing the of solutions which are construction schedules. Rank have been obtained through the use of task scheduling rules and the application of the KASS software. The aim of the work is the choice of the equivalent solution in terms of the total time of the project. The selected solution optimization task should be characterized by the highest resistance to harmful environmental risk factors. To asses the stability of schedule simulation technique was used. |
- Informations
sur cette fiche - Reference-ID
10476840 - Publié(e) le:
25.11.2020 - Modifié(e) le:
25.11.2020