M. Krzemiński
- Optimization of Work Schedules Executed using the Flow Shop Model, Assuming Multitasking Performed by Work Crews. Dans: Archives of Civil Engineering, v. 63, n. 4 (décembre 2017). (2017):
- Construction Scheduling and Stability of the Resulting Schedules. Dans: Archives of Civil Engineering, v. 62, n. 2 (juin 2016). (2016):