Optimization of Work Schedules Executed using the Flow Shop Model, Assuming Multitasking Performed by Work Crews

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Archives of Civil Engineering, , n. 4, v. 63
Page(s): 3-19
DOI: 10.1515/ace-2017-0037
Abstrait:

The problem described in this paper deals with construction project scheduling for multi-object projects. The use of the flow shop model allows for quick execution through optimal, simultaneous means of production. The correct order of tasks according to assumed criteria is the subject of a lot of research. In this paper, we have focused on the aspect of multi-project work crews. In practice, we often observe cases where overburdened crews are supported by ones with downtime. This paper presents a newly developed model used to smoothe out schedules in terms of maintaining crew work continuity. A full description of the algorithm and example usage are presented.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1515/ace-2017-0037.
  • Informations
    sur cette fiche
  • Reference-ID
    10476757
  • Publié(e) le:
    25.11.2020
  • Modifié(e) le:
    25.11.2020
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine