Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method
Author(s): |
Daniel Castro-Lacouture
Gürsel A. Süer Julian Gonzalez-Joaqui J. K. Yates |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, October 2009, n. 10, v. 135 |
Page(s): | 1096-1104 |
DOI: | 10.1061/(asce)0733-9364(2009)135:10(1096) |
- About this
data sheet - Reference-ID
10164159 - Published on:
07/12/2018 - Last updated on:
07/12/2018