-
Yates, J. K. (2011): The Art of Negotiation in Construction Contract Disputes. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 3, n. 3 (August 2011).
https://doi.org/10.1061/(asce)la.1943-4170.0000060
-
Yates, J. K. (2010): Art of Mediation in the Engineering and Construction Industry. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 3 (August 2010).
https://doi.org/10.1061/(asce)la.1943-4170.0000041
-
El-adaway, Islam H. / Ezeldin, A. Samer / Yates, J. K. (2009): Arbitral Tribunal Proceedings Case Study: Egyptian Large-Scale Construction Project. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 3 (August 2009).
https://doi.org/10.1061/(asce)1943-4162(2009)1:3(147)
-
Yates, J. K. (2001): Retention of Nontraditional Engineering and Construction Professionals. In: Journal of Management in Engineering (ASCE), v. 17, n. 1 (January 2001).
https://doi.org/10.1061/(asce)0742-597x(2001)17:1(41)
-
Yates, J. K. / Aniftos, Stylianos (1998): Developing Standards and International Standards Organizations. In: Journal of Management in Engineering (ASCE), v. 14, n. 4 (July 1998).
https://doi.org/10.1061/(asce)0742-597x(1998)14:4(57)
-
Yates, J. K. (1995): Use of Design/Build in E/C Industry. In: Journal of Management in Engineering (ASCE), v. 11, n. 6 (November 1995).
https://doi.org/10.1061/(asce)0742-597x(1995)11:6(33)
-
Yates, J. K. (2007): Globalization of Engineering and Construction Legal Issues. In: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 3 (July 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:3(169)
-
Yates, J. K. / Smith, Joseph A. (2007): Global Legal Issues for Engineers and Constructors. In: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 3 (July 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:3(199)
-
Yates, J. K. / Duran, Juan (2006): Utilizing Dispute Review Boards in Relational Contracting: A Case Study. In: Journal of Professional Issues in Engineering Education and Practice, v. 132, n. 4 (October 2006).
https://doi.org/10.1061/(asce)1052-3928(2006)132:4(334)
-
Yates, J. K. / Epstein, Alan (2006): Avoiding and Minimizing Construction Delay Claim Disputes in Relational Contracting. In: Journal of Professional Issues in Engineering Education and Practice, v. 132, n. 2 (April 2006).
https://doi.org/10.1061/(asce)1052-3928(2006)132:2(168)
-
Yates, J. K. (2013): Sustainable methods for waste minimisation in construction. In: Construction Innovation, v. 13, n. 3 (July 2013).
https://doi.org/10.1108/ci-nov-2011-0054
-
Yates, J. K. (2013): Engineering Careers Case Study: K–12 Recruitment Initiative. In: Leadership and Management in Engineering (ASCE), v. 13, n. 1 (January 2013).
https://doi.org/10.1061/(asce)lm.1943-5630.0000211
-
Yates, J. K. (2012): University Education Dilemma: The Challenge of Balancing Teaching with Scholarship. In: Leadership and Management in Engineering (ASCE), v. 12, n. 2 (April 2012).
https://doi.org/10.1061/(asce)lm.1943-5630.0000161
-
Yates, J. K. (2010): Engineering Knowledge versus Skills. In: Leadership and Management in Engineering (ASCE), v. 10, n. 3 (July 2010).
https://doi.org/10.1061/(asce)lm.1943-5630.0000064
-
Yates, J. K. (1990): Data‐Base Systems for Evaluating Construction Programs. In: Journal of Construction Engineering and Management, v. 116, n. 4 (December 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:4(624)
-
Yates, J. K. (1993): Construction Decision Support System for Delay Analysis. In: Journal of Construction Engineering and Management, v. 119, n. 2 (June 1993).
https://doi.org/10.1061/(asce)0733-9364(1993)119:2(226)
-
Yates, J. K. / Battersby, Leslie C. (2003): Master Builder Project Delivery System and Designer Construction Knowledge. In: Journal of Construction Engineering and Management, v. 129, n. 6 (December 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:6(635)
-
Castro-Lacouture, Daniel / Süer, Gürsel A. / Gonzalez-Joaqui, Julian / Yates, J. K. (2009): Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path Method. In: Journal of Construction Engineering and Management, v. 135, n. 10 (October 2009).
https://doi.org/10.1061/(asce)0733-9364(2009)135:10(1096)
-
Yates, J. K. (2014): Design and Construction for Sustainable Industrial Construction. In: Journal of Construction Engineering and Management, v. 140, n. 4 (April 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000673
-
Yates, J. K. (2014): Diseño y Construccion para una Construccion Industrial Sustentable. In: Journal of Construction Engineering and Management, v. 140, n. 4 (April 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000683