Construction of reinforced concrete multi‐storey office buildings: A simulation model for time/cost calculations
First stage computer simulation model for the duration and cost estimation of the construction of a typical multi‐storey concrete framed office building providing rapid response to changes in input values and their effect on the duration and cost of the project
This publication has been cited in the following 1 other publication(s):
Advertisement
About this data sheet
Reference-ID 10366849
Published on: 27/08/2019
Last updated on: 27/08/2019
Advertisement
Structurae cooperates with
Advertisement
You have exceeded your monthly download limit!
Structurae Plus subscribers can download 30 media files or data sets per month.
Structurae Pro users are limited to 50.
Do you really want to delete this item from your favorites?
The item was successfuly added to the shopping cart.Could not add item to the shopping cart. Please try again.This item has already been added to the shopping cart and cannot be added again.