Construction of reinforced concrete multi‐storey office buildings: A simulation model for time/cost calculations
First stage computer simulation model for the duration and cost estimation of the construction of a typical multi‐storey concrete framed office building providing rapid response to changes in input values and their effect on the duration and cost of the project
Author(s): |
E. Laptali
N. Bouchlaghem S. Wild |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Building Research & Information, 1995, n. 4, v. 23 |
Page(s): | 227-233 |
DOI: | 10.1080/09613219508727464 |
- About this
data sheet - Reference-ID
10366849 - Published on:
27/08/2019 - Last updated on:
27/08/2019