0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction of reinforced concrete multi‐storey office buildings: A simulation model for time/cost calculations

First stage computer simulation model for the duration and cost estimation of the construction of a typical multi‐storey concrete framed office building providing rapid response to changes in input values and their effect on the duration and cost of the project

Author(s):


Medium: journal article
Language(s): English
Published in: Building Research & Information, , n. 4, v. 23
Page(s): 227-233
DOI: 10.1080/09613219508727464
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/09613219508727464.
  • About this
    data sheet
  • Reference-ID
    10366849
  • Published on:
    27/08/2019
  • Last updated on:
    27/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine