0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction delays: a case study in the Brazilian Amazon

Author(s):




Medium: journal article
Language(s): English
Published in: Ambiente Construído, , n. 3, v. 17
Page(s): 167-181
DOI: 10.1590/s1678-86212017000300169
Abstract:

he construction industry is one of the industrial sectors with the lowest rates of fulfilment of contract deadlines, especially in developing countries. This fact has been the focus of considerable discussions seeking to identify the causes of the delays. The main purpose of this paper is to use factor analysis to identify the factors that are correlated with delay, contemplating exclusively residential real estate projects and using a city in the Brazilian Amazon as a case study. Based on the database from the government agency that authorises constructions in the city of Belém (City Planning Department - Secretaria Municipal de Urbanismo, SEURB) and data from construction companies, the study investigated 274 construction projects from the past 11 years. Factor analysis and work with the variables that can be identified and measured in the initial phase of the project, i.e., during the feasibility study, demonstrate that the physical characteristics of the apartments and the construction project are the primary causes for variations in construction delays; these causes have not yet been reported in the literature. We hope that the results of this study will contribute to more consistent forecasting of construction time, minimising the risk of delays.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1590/s1678-86212017000300169.
  • About this
    data sheet
  • Reference-ID
    10412726
  • Published on:
    12/02/2020
  • Last updated on:
    12/02/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine