0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

André Augusto Azevedo Montenegro Duarte

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Maués, Luiz Maurício Furtado / Sá, José Alberto Silva de / Costa Junior, Carlos Tavares da / Kern, Andrea Parise / Duarte, André Augusto Azevedo Montenegro (2019): Construction duration predictive model based on factorial analysis and fuzzy logic. In: Ambiente Construído, v. 19, n. 4 (December 2019).

    https://doi.org/10.1590/s1678-86212019000400346

  2. Maués, Luiz Maurício Furtado / Santana, Wylliam Bessa / Santos, Paulo Cerqueira dos / Neves, Renato Martins das / Duarte, André Augusto Azevedo Montenegro (2017): Construction delays: a case study in the Brazilian Amazon. In: Ambiente Construído, v. 17, n. 3 (July 2017).

    https://doi.org/10.1590/s1678-86212017000300169

  3. Coutinho, Lêda Sílvia de Aguiar Lédo / Duarte, André Augusto Azevedo Montenegro / Neves, Renato Martins das / Coutinho Neto, Benedito / Maneschy, Carlos Edilson de Almeida / Pinheiro, Ana Maria Guerra Seráfico (2012): Modelagem do tempo de execução de obras civis: estudo de caso na Universidade Federal do Pará. In: Ambiente Construído, v. 12, n. 1 (March 2012).

    https://doi.org/10.1590/s1678-86212012000100016

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine