Constructing a cut-off dam inside a water-filled circular tunnel with backfill grouting
Author(s): |
Che-An Chou
Shih-Wen Chen Shih-Hao Cheng Hung-Jiun Liao |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, May 2024, v. 147 |
Page(s): | 105742 |
DOI: | 10.1016/j.tust.2024.105742 |
- About this
data sheet - Reference-ID
10770394 - Published on:
29/04/2024 - Last updated on:
29/04/2024