Hung-Jiun Liao
- Constructing a cut-off dam inside a water-filled circular tunnel with backfill grouting. In: Tunnelling and Underground Space Technology, v. 147 (May 2024). (2024):
- Grouting to remove piles from a tunnelling machine cutter-head. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 168, n. 4 (August 2015). (2015):
- Base stability of deep excavation in clay reinforced with grout piles. In: Proceedings of the Institution of Civil Engineers - Ground Improvement, v. 171, n. 1 (February 2018). (2018):
- Remedial Measures for Existing Anchored Slopes in Taiwan. In: Journal of Performance of Constructed Facilities (ASCE), v. 33, n. 3 (June 2019). (2019):
- Method of Up-Slope Mitigation Priority for Alishan Mountain Road in Taiwan. In: Journal of Performance of Constructed Facilities (ASCE), v. 24, n. 4 (August 2010). (2010):