Constraint-Based Planning with Integrated Production Scheduler over Internet
Author(s): |
D. K. H. Chua
L. J. Shen S. H. Bok |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, June 2003, n. 3, v. 129 |
Page(s): | 293-301 |
DOI: | 10.1061/(asce)0733-9364(2003)129:3(293) |
- About this
data sheet - Reference-ID
10159669 - Published on:
11/12/2018 - Last updated on:
11/12/2018