S. H. Bok
- Constraint-Based Planning with Integrated Production Scheduler over Internet. In: Journal of Construction Engineering and Management, v. 129, n. 3 (June 2003). (2003):
- Process-Parameter-Interface Model for Design Management. In: Journal of Construction Engineering and Management, v. 129, n. 6 (December 2003). (2003):