The conclusions of risk analysis as a basis for deciding between variants through the example of Contract H8 / Ein Fazit zur Risikoanalyse als Grundlage für eine Variantenentscheidung am Beispiel Los H8
Author(s): |
Markus Spiegl
Philip Sander Alfred Pellar Ulrich Maidl Johann Herdina Klaus Feistmantl |
---|---|
Medium: | journal article |
Language(s): | English, German |
Published in: | Geomechanics and Tunnelling, 2011, n. 4, v. 4 |
Page(s): | 295-304 |
DOI: | 10.1002/geot.201100017 |
Abstract: |
The Brenner Eisenbahn GmbH (BEG) was appointed in 1995 to design and construct the new railway line in the Lower Inn Valley between the national border near Kufstein and Innsbruck. In the densely populated Inn Valley, large parts of the line with a planned speed of 250 km/h had to be run through tunnels. Near Jenbach, a semi-quantitative process was used as part of a risk analysis for the decision between the variants of a shallow, mined special construction and a deep mechanically driven tunnel. |
Keywords: |
tunneling method risk catalogue semi-quantitative methods probabilistic methods
|