Conceptual Cost Estimations Using Neuro-fuzzy and Multi-factor Evaluation Methods for Building Projects

Author(s):




Medium: journal article
Language(s): Latvian
Published in: Journal of Civil Engineering and Management, , n. 1, v. 23
Page(s): 1-14
DOI: 10.3846/13923730.2014.948908
Abstract:

During the conceptual phase of a construction project, numerous uncertainties make accurate cost estimation challenging. This work develops a new model to calculate conceptual costs of building projects for effective cost control. The proposed model integrates four mathematical techniques (sub-models), namely, (1) the component ratios sub-model, (2) fuzzy adaptive learning control network (FALCON) and fast messy genetic algorithm (fmGA) based sub-model, (3) regression sub-model, and (4) multi-factor evaluation sub-model. While the FALCON- and fmGA-based sub-model trains the historical cost data, three other sub-models assess the inputs systematically to estimate the cost of a new pro­ject. This study also closely examines the behavior of the proposed model by evaluating two modified models without considering fmGA and undertaking sensitivity analysis. Evaluation results indicate that, with the ability to more thor­oughly respond to the project characteristics, the proposed model has a high probability of increasing estimation accura­cies more than the three conventional methods, i.e., average unit cost, component ratios, and linear regression methods.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3846/13923730.2014.948908.
  • About this
    data sheet
  • Reference-ID
    10354311
  • Published on:
    13/08/2019
  • Last updated on:
    13/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine