0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Nguyen, Ngoc-Mai / Wang, Wei-Chih / Cao, Minh-Tu (2023): Early estimation of the long-term deflection of reinforced concrete beams using surrogate models. In: Construction and Building Materials, v. 370 (March 2023).

    https://doi.org/10.1016/j.conbuildmat.2023.130670

  2. Wang, Wei-Chih / Nguyen, Ngoc-Mai / Cao, Minh-Tu (2022): Smart ensemble machine learner with hyperparameter-free for predicting bond capacity of FRP-to-concrete interface: Multi-national data. In: Construction and Building Materials, v. 345 (August 2022).

    https://doi.org/10.1016/j.conbuildmat.2022.128158

  3. Cao, Minh-Tu / Nguyen, Ngoc-Mai / Wang, Wei-Chih (2022): Using an evolutionary heterogeneous ensemble of artificial neural network and multivariate adaptive regression splines to predict bearing capacity in axial piles. In: Engineering Structures, v. 268 (October 2022).

    https://doi.org/10.1016/j.engstruct.2022.114769

  4. Yang, Li-Hsi / Xu, Liuya / Wang, Wei-Chih / Wang, Shih-Hsu (2020): Building Information Model and Optimization Algorithms for Supporting Campus Facility Maintenance Management: A Case Study of Maintaining Water Dispensers. In: KSCE Journal of Civil Engineering, v. 25, n. 1 (October 2020).

    https://doi.org/10.1007/s12205-020-0219-7

  5. Dzeng, Ren-Jye / Wang, Wei-Chih / Hsiao, Fan-Yi / Xie, Yan-Qing (2015): An Activity-Based Simulation Model for Assessing Function Space Assignment for Buildings: A Service Performance Perspective. In: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 12 (November 2015).

    https://doi.org/10.1111/mice.12177

  6. Hsiao, Fan-Yi / Wang, Shih-Hsu / Wang, Wei-Chih / Wen, Chao-Pao / Yu, Wen-der (2012): Neuro-Fuzzy Cost Estimation Model Enhanced by Fast Messy Genetic Algorithms for Semiconductor Hookup Construction. Neuro-fuzzy cost estimation model. In: Computer-Aided Civil and Infrastructure Engineering, v. 27, n. 10 (October 2012).

    https://doi.org/10.1111/j.1467-8667.2012.00786.x

  7. Wang, Wei-Chih / Bilozerov, Tymur / Dzeng, Ren-Jye / Hsiao, Fan-Yi / Wang, Kun-Chi (2017): Conceptual Cost Estimations Using Neuro-fuzzy and Multi-factor Evaluation Methods for Building Projects. In: Journal of Civil Engineering and Management, v. 23, n. 1 (January 2017).

    https://doi.org/10.3846/13923730.2014.948908

  8. Wang, Shih-Hsu / Wang, Wei-Chih / Hsu, Pei-Yuan / Chen, Ci-Hao / Wang, Kun-Chi (2016): Establishing Engineering S-curves To Evaluate Supervision Engineer Allocations for Highway Construction Projects. In: Journal of Civil Engineering and Management, v. 22, n. 7 (July 2016).

    https://doi.org/10.3846/13923730.2014.928363

  9. Yang, Jyh-Bin / Wang, Han-Hsiang / Wang, Wei-Chih / Ma, Shin-Min (2016): Using Data Envelopment Analysis To Support Best-value Contractor Selection. In: Journal of Civil Engineering and Management, v. 22, n. 2 (March 2016).

    https://doi.org/10.3846/13923730.2014.897984

  10. Dzeng, Ren-Jye / Wang, Wei-Chih / Hsiao, Fan-Yi (2015): Function-space Assignment and Movement Simulation Model for Building Renovation. In: Journal of Civil Engineering and Management, v. 21, n. 5 (May 2015).

    https://doi.org/10.3846/13923730.2014.890652

  11. Chen, Chun-Sung / Tsui, Yu-Kun / Dzeng, Ren-Jye / Wang, Wei-Chih (2014): Application of Project-based Change Management in Construction: A Case Study. In: Journal of Civil Engineering and Management, v. 21, n. 1 (December 2014).

    https://doi.org/10.3846/13923730.2013.802712

  12. Wang, Wei-Chih / Lin, Chia-Li / Wang, Shih-Hsu / Liu, Jang-Jeng / Lee, Ming-Tsung (2014): Application of Importance-satisfaction Analysis and Influence-relations Map To Evaluate Design Delay Factors. In: Journal of Civil Engineering and Management, v. 20, n. 4 (July 2014).

    https://doi.org/10.3846/13923730.2013.801922

  13. Wang, Wei-Chih / Yu, Wen-der / Yang, I-Tung / Lin, Chun-Chang / Lee, Ming-Tsung / Cheng, Yuan-Yuan (2013): Applying the Ahp To Support the Best-value Contractor Selection – Lessons Learned From Two Case Studies in Taiwan. In: Journal of Civil Engineering and Management, v. 19, n. 1 (October 2013).

    https://doi.org/10.3846/13923730.2012.734851

  14. Wang, Wei-Chih / Demsetz, Laura A. (2000): Model for Evaluating Networks under Correlated Uncertainty—NETCOR. In: Journal of Construction Engineering and Management, v. 126, n. 6 (December 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:6(458)

  15. Wang, Wei-Chih / Demsetz, Laura A. (2000): Application Example for Evaluating Networks Considering Correlation. In: Journal of Construction Engineering and Management, v. 126, n. 6 (December 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:6(467)

  16. Wang, Wei-Chih (2002): SIM-UTILITY: Model for Project Ceiling Price Determination. In: Journal of Construction Engineering and Management, v. 128, n. 1 (February 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:1(76)

  17. Wang, Wei-Chih (2002): Simulation-Facilitated Model for Assessing Cost Correlations. In: Computer-Aided Civil and Infrastructure Engineering, v. 17, n. 5 (September 2002).

    https://doi.org/10.1111/1467-8667.00283

  18. Wang, Wei-Chih / Dzeng, Ren-Jye / Lu, Yu-Huang (2007): Integration of Simulation-Based Cost Model and Multi-Criteria Evaluation Model for Bid Price Decisions. In: Computer-Aided Civil and Infrastructure Engineering, v. 22, n. 3 (April 2007).

    https://doi.org/10.1111/j.1467-8667.2007.00480.x

  19. Dzeng, Ren-Jye / Wang, Wei-Chih (2003): Automatic schedule integration for highway projects. In: Automation in Construction, v. 12, n. 4 (July 2003).

    https://doi.org/10.1016/s0926-5805(03)00017-7

  20. Lin, Chun-Chang / Wang, Wei-Chih / Yu, Wen-der (2008): Improving AHP for construction with an adaptive AHP approach (A3). In: Automation in Construction, v. 17, n. 2 (January 2008).

    https://doi.org/10.1016/j.autcon.2007.03.004

  21. Wang, Wei-Chih / Yang, Jyh-Bin (2005): Applications of electronically facilitated bidding model to preventing construction disputes. In: Automation in Construction, v. 14, n. 5 (October 2005).

    https://doi.org/10.1016/j.autcon.2005.01.001

  22. Yang, I-Tung / Wang, Wei-Chih / Yang, Tzu-I (2012): Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy process. In: Automation in Construction, v. 22 (March 2012).

    https://doi.org/10.1016/j.autcon.2011.09.004

  23. Wang, Wei-Chih / Liu, Jang-Jeng / Chou, Shih-Chieh (2006): Simulation-based safety evaluation model integrated with network schedule. In: Automation in Construction, v. 15, n. 3 (May 2006).

    https://doi.org/10.1016/j.autcon.2005.06.015

  24. Lai, Yu-Ting / Wang, Wei-Chih / Wang, Han-Hsiang (2008): AHP- and simulation-based budget determination procedure for public building construction projects. In: Automation in Construction, v. 17, n. 5 (July 2008).

    https://doi.org/10.1016/j.autcon.2007.10.007

  25. Wang, Wei-Chih / Liu, Jang-Jeng / Liao, Tzong-Shiun (2006): Modeling of design iterations through simulation. In: Automation in Construction, v. 15, n. 5 (September 2006).

    https://doi.org/10.1016/j.autcon.2005.07.010

  26. Wang, Kun-Chi / Wang, Wei-Chih / Wang, Han-Hsiang / Hsu, Pei-Yuan / Wu, Wei-Hao / Kung, Cheng-Ju (2016): Applying building information modeling to integrate schedule and cost for establishing construction progress curves. In: Automation in Construction, v. 72 (December 2016).

    https://doi.org/10.1016/j.autcon.2016.10.005

  27. Wang, Shih-Hsu / Wang, Wei-Chih / Wang, Kun-Chi / Shih, Shih-Yu (2015): Applying building information modeling to support fire safety management. In: Automation in Construction, v. 59 (November 2015).

    https://doi.org/10.1016/j.autcon.2015.02.001

  28. Wang, Wei-Chih / Weng, Shao-Wei / Wang, Shih-Hsu / Chen, Cheng-Yi (2014): Integrating building information models with construction process simulations for project scheduling support. In: Automation in Construction, v. 37 (January 2014).

    https://doi.org/10.1016/j.autcon.2013.10.009

  29. Wang, Wei-Chih (2004): Electronic-Based Procedure for Managing Unbalanced Bids. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:3(455)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine