Comparative analysis of seismic performance of 122-meter long concrete-filled steel tube arched chord truss bridge before and after reinforcement
Author(s): |
Daihai Chen
Wenze Wang Zheng Li Zhenqi Xu Fengrui Ma |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Asian Architecture and Building Engineering, February 2020, n. 2, v. 19 |
Page(s): | 1-13 |
DOI: | 10.1080/13467581.2020.1716772 |
- About this
data sheet - Reference-ID
10409424 - Published on:
16/01/2020 - Last updated on:
25/02/2020