Comparative analysis of seismic performance of 122-meter long concrete-filled steel tube arched chord truss bridge before and after reinforcement
Auteur(s): |
Daihai Chen
Wenze Wang Zheng Li Zhenqi Xu Fengrui Ma |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Asian Architecture and Building Engineering, février 2020, n. 2, v. 19 |
Page(s): | 1-13 |
DOI: | 10.1080/13467581.2020.1716772 |
- Informations
sur cette fiche - Reference-ID
10409424 - Publié(e) le:
16.01.2020 - Modifié(e) le:
25.02.2020