0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Change Order Provisions under National and International Standard Forms of Contract

Author(s): (Associate Professor and Construction Engineering and Management Program Coordinator, Dept. of Civil and Environmental Engineering, Univ. of Tennessee–Knoxville, 851 Neyland Dr., 417 John D. Tickle Bldg., Knoxville, TN 37996 (corresponding author).)
(Contracts Manager, FCIArb, Dar Al Mimar Group; Instructor, Engineering and Sciences Services, American Univ., 1 Abu Bakr El Seddik St., Dokki, Giza, Cairo, Egypt.)
(Undergraduate Student, Dept. of Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., Walker Engineering Bldg., Mississippi State, MS 39762.)
(Undergraduate Student, Dept. of Civil and Environmental Engineering, Mississippi State Univ., 501 Hardy Rd., Walker Engineering Bldg., Mississippi State, MS 39762.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 3, v. 8
Page(s): 03716001
DOI: 10.1061/(asce)la.1943-4170.0000187
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000187.
  • About this
    data sheet
  • Reference-ID
    10579813
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine